LogoWorks Clean Room Remodel

Page 1  |  Page 2  |  Page 3
Wall is Dry - Beginning to Install Rubber Tub Surround
Wall is Dry - Beginning to Install Rubber Tub Surround
Rubber Surround Material on Partition Wall
Rubber Surround Material on Partition Wall
Ready for Outside Bathroom Wall
Ready for Outside Bathroom Wall
Bathroom Wall Dryed
Bathroom Wall Dryed
Another Angle
Another Angle
Another Angle
Another Angle
Hardibacker Installation
Hardibacker Installation
Another Angle
Another Angle
Vulkem®116Weatherproofing Sealant</strong> (Buff-Color)
Vulkem®116Weatherproofing Sealant (Buff-Color)
Vulkem®116Weatherproofing Sealant</strong> (White- Color)
Vulkem®116Weatherproofing Sealant (White- Color)
Finishing Taping Hardibacker
Finishing Taping Hardibacker
More Vulkeen Being Applied To All Joints and Floors
More Vulkem Being Applied To All Joints and Floors
Vulkem Being Applied
Vulkem Being Applied
3 Coats of Base Applied To Walls
3 Coats of Base Applied To Walls
Semi Gloss 2 Coats To All Walls
Semi Gloss 2 Coats To All Walls
Another Angle
Another Angle
I was pretty proud how this turned out so I took alot of photo's
I was pretty proud how this turned out so I took alot of photo's
Installing Tub Surround
Installing Tub Surround
...more installation of surround
...more installation of surround
Back corners of surround (left)
Back corners of surround (left)
Back right corner of surround
Back right corner of surround
Filler Photo
Filler Photo
Finishing Tub Surround Install
Finishing Tub Surround Install
Closeup of Lower Right Corner after Vulkem was applied. (Silicon Applied to All Screw Holes)
Closeup of Lower Right Corner after Vulkem was applied. (Silicon Applied to All Screw Holes)
Lower Right Corner
Lower Right Corner
Another Photo of Right Corner
Another Photo of Right Corner
Plug-In and Switch to Operate Light and Pressure Washer
Plug-In and Switch to Operate Light and Pressure Washer
Wall Facing Dark Room
Wall Facing Dark Room
Upper Right of Surround
Upper Right of Surround
Brand New Plumbing
Brand New Plumbing